New bespoke in-duct finned-tube superheater, designed, manufactured, and supplied by Thorne International Boiler Services Ltd. in 2023 to an overseas chemical plant as part of power generating project.

TAG-boiler.jpg

Specification

Duty
Operating pressure
Operating temperature
Design code
Year of manufacture
Industry
Scope of supply

17,000 kg/h

20.0 barg

275°C

BE EN 12952

2023

Chemical

Casing | Insulation/cladding | Expansion joint | External piping

    Design temperature of 570°C considered to allow for transient and worst-case plant conditions.

    Designed to receive clean flue gas at 467°C and saturated steam at 212.4°C, producing superheated steam at 275°C at a duty / flowrate of 17,000 kg/h.

    Superheater designed in accordance with BS EN 12952 / PED, including NoBo design and manufacturing appraisal.

    Supplied with stainless steel casing, including internal insulation and carbon steel supporting structure.

    Supplied by Thorne International Boiler Services Ltd. DAP to client.
a548b0e3-bc39-4086-9600-5511c19ae183.jpg
background 2.png

Thorne International Boiler Services (TIBS) offer comprehensive steam boiler services to industrial and commercial environments. From new installations and refurbishments to reverse engineering, our experienced team are committed to supporting clients from the design phase, right the way through to installation and commissioning.